摘要
进度管理是为确保项目按合同工期完成所有必须完成的工作而进行的管理。结合实际工作,从编制进度计划、进度跟踪控制两方面分析了工程项目进度管理的流程和方法,并根据工作经验,针对进度管理工作中存在的问题提出了措施建议。
Progress management is a management to ensure that the project must be completed in accordance with the contract time. The paper analyzes the process flow and method of progress management of engineering project from two aspects of the progress plan preparation and progress tracking and control. According to the work experience, the paper puts forward the measures and suggestions to ensure the successful progress of the management.
出处
《有色冶金设计与研究》
2016年第5期111-113,共3页
Nonferrous Metals Engineering & Research
关键词
进度管理
WBS
关键路径
S曲线
横道图
progress management
WBS
critical path
S curve
process management