摘要
在深圳地铁1号线增购车辆首列车试制过程中,中央立柱扶手出现晃动。文章通过对扶手固定点的受力分析,介绍了对该项目松动扶手的改进措施。
The central handrails appear sloshing during the first trial-production of Shenzhen Metro Line 1 purchase vehicle. According to the force analysis of fixed point for handrail, this paper presents the improved measures for the sloshing handrails.
出处
《电力机车与城轨车辆》
2016年第6期58-59,69,共3页
Electric Locomotives & Mass Transit Vehicles
关键词
扶手
安装座
受力分析
改进措施
handrail
fitting seat
force analysis
improved measure