老挝水电工程实施阶段处理对象管理初探

Processing Object Management in Implementation Stage of Hydropower Projects in Laos
下载PDF
导出
摘要 通过对老挝水电工程实施阶段建设征地范围的界定和处理对象管理工作的现状、工作组织及实施过程的总结,梳理了在老挝开展水电工程处理对象管理的一般方法、存在问题,并提出了老挝水电工程开展此项工作的建议,以期为后续中资企业开发老挝水电工程理顺参与处理对象管理的相关各方的职责与分工,为后期顺利完成土地征收和移民安置工作提供有益的参考。 The definition experience of the construction land acquisition scope in implementation stage of hydropower projects in Laos is summarized. The current status,work organization and implementation process of the processing object management in these projects are introduced. The commonly adopted approaches,existing problems and corresponding suggestions are presented for the processing object management in hydropower projects in Laos. It could be a useful reference for Chinese companies to clarify the responsibilities and duties of relevant parties involved in the processing object management in hydropower projects in Laos,and thus successfully complete the land acquisition and resettlement work.
出处 《水电与新能源》 2016年第11期41-44,共4页 Hydropower and New Energy
关键词 老挝 水电工程 实物指标 调查 Laos hydropower projects physical indicator investigation
  • 相关文献

参考文献4

二级参考文献7

  • 1老挝.《能源-矿业第六个五年发展规划(2006-2010年)》,老挝国家政治出版社,2006年.
  • 2云南省发改委等.《老挝北部九省发展规划》,《课题研究报告》2008年.
  • 3马勇.《越南、老挝、缅甸电力投资法律分析》,《课题研究报告》2008年.
  • 4谢彩文等.《土地换资本,十年五十倍:中资外资在老挝获得土地特许经营项目调查报告》,《广西日报》,2013年2月19日,http://www.gxrb.com.en/htm]/2013-02/19/content一788986.htm.2013-06-28.
  • 5《世行预测今年老挝GDP将增长8%》,2013年10月8日.http://woHd.xinhua08.com/a/20131008/1256691.shtml,2013年11月12日.
  • 6郭继光.中国企业在柬埔寨的投资及其影响[J].东南亚研究,2011(4):37-44. 被引量:16
  • 7盖斌.水电站水库移民补偿研究[J].乌蒙论坛,2006,0(1):60-68. 被引量:8

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部