摘要
更换发电机组是钻井平台常见的工程,涉及到的管路系统有燃油系统、滑油系统、冷却系统、排气系统,启动空气系统。文章通过实例阐述了更换发电机组相关管路设计中常用的一些计算及设计理念,为船厂工程师日常工作提供参考。
Replacement of power generator sets is a common project in drilling platform. It's related to the pipeline systems with fuel system, lubricating system, cooling system, exhaust system and air-starting system. Through an example, some calculation and design concept commonly used are explained in replacement of power generator sets. It provides guidance for shipyard engineers" daily work.
出处
《中国修船》
2016年第6期53-55,共3页
China Shiprepair
关键词
钻井平台
发电机组更换
燃油系统
滑油系统
冷却系统
排气系统
启动空气
系统
drilling platform
replacement of generating sets
fuel system
lubricating system
cooling system
exhaust system
air-starting system