期刊文献+

饱和粉细砂层内盾构机主驱动密封缺陷修复地层加固综合技术应用研究 被引量:1

Comprehensive Study of Shield Machine Main Drive Seal Formation Defect Repair Technology and its Application for Stratum Reinforcement in Saturated Slit and Fine Sand
下载PDF
导出
摘要 文章以南京地铁三号线过江隧道工程为例,分析了长江漫滩饱和粉细砂地层中大直径泥水盾构掘进过程中主驱动密封检查、更换时作业风险,在比对常用加固技术措施和实际操作可行性基础上,探索实践了MJS加固技术与盾尾环箍注浆相结合为地铁工程主驱动密封缺陷检修提供安全作业条件的成功运用,为今后类似工程施工提供了一个成功的借鉴案例。 The paper analysed risk in the construction operation during main drive seal inspections and replacements in the large diameter slurry shield tunneling process in the saturated sand stratum of the Yangtze River Floodplain, taking Cross River Tunnel Project for the construction of Nanjing Metro Line Three for example. Considering common applications of reinforcement technology and their practical feasibilities, the application combining MJS strengthening technology and shield tail hoop grouting for the provision of safe operating conditions for the main drive seal defect repair in metro engineering was also researched and practiced. It could be considered as a well-developed model of similar cases in future projects.
作者 李长春 谢波
出处 《江苏建筑》 2016年第5期65-67,72,共4页 Jiangsu Construction
关键词 饱和粉细砂地层 MJS加固技术 环箍注浆 盾构主驱动密封缺陷修复 saturated sand stratum MJS reinforcement technology hoop grouting shield main drive seal defect repair in shield construction
  • 相关文献

参考文献4

二级参考文献7

共引文献90

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部