摘要
抚顺东露天矿目前采用的主要开拓方式为铁路开拓,开采工艺为单斗挖掘机-铁道开采工艺,63站是东露天矿的大型站场,每年需要跟随采区向北移动80 m左右,每次移设工程量巨大,因此,对63站进行一次性中长期移设至关重要。
Fushun East Open-pit Mine currently uses the way of railway development, mining technology for single bucket excavator railway mining technology. 63 station is large station yard in east open-pit mine, which moves northward about 80 meters following mining area, and sets up a large amount of engineering each shift. Therefore, 63 station long-term shift is very important.
出处
《露天采矿技术》
CAS
2016年第10期28-30,共3页
Opencast Mining Technology
关键词
电铁运输
站场移设
运输效率
electric iron transportation
station field shift
transportation efficiency