期刊文献+

斜井盾构地下可拆解刀盘结构设计 被引量:3

Design of the Disassembly Cutter Structure and Dismantling Technology for Shield Machine Underground in Inclined Shaft
下载PDF
导出
摘要 盾构斜井地下拆解受空间及地质条件等多方因素的影响,无法直接进行刀盘吊装拆解。为实现盾构刀盘在斜井地下有限空间内安全、快速、高效拆解,必须开展盾构刀盘可拆解结构形式研究。在盾构研发设计阶段,结合盾构施工斜井工程设备要求和盾构地下拆解施工条件,将刀盘分块设计理念植入到盾构刀盘结构设计中,对盾构刀盘的重量、结构尺寸等关键可拆解结构参数进行分析设计。 Shield inclined shaft underground dismantling 'affected space and geological conditions and other factors. It cannot directly carry out the dismantling of cutter. In order to realize the shield safety, in inclined underground space is limited in rapid and efficient dismantling, research on cutter structure type of shield can be carried out. Therefore, according to the construction of inclined shaft engineering equipment and shield underground dismantling construction conditions, the design concept of the cutter block is embedded in the shield cutter structure design in the research and design phase of the structure are studied in this paper. shield, and the weight and size of dismantling cutter
作者 徐震
出处 《装备制造技术》 2016年第10期1-4,共4页 Equipment Manufacturing Technology
基金 国家科技支撑计划资助项目:煤矿长距离斜井盾构原位地下拆解及配套技术(2013BAB10B03)
关键词 盾构 斜井 地下 拆解 刀盘 shield slope underground dismantling cutter
  • 相关文献

参考文献3

二级参考文献11

共引文献41

同被引文献30

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部