摘要 HD1080A-1T低压模块在装配过程中,其上下半垂直法兰面的锥销孔是在缸体接配好之后进行配钻,由于条件的制约,万向摇臂钻无法完全满足要求。通过几种加工方法的分析对比,提出了以液压磁力钻配合相应工装的方法解决了生产中的难题,并在实践中得到了应用。 In the assembly process of HD1080A-1T nuclear power low-voltage module, the upper and lower half of the vertical flange of the cone in the cylinder pin hole is connected with a good distribution after the drill. As conditions set, universal radial drilling cannot fully meet the requirements. Through analysis and comparison of several processing methods, the production problems have been solved by matching the hydraulic magnetic drill and tooling methods, and these methods have been applied in practice.
作者 刘墨涵
出处 《装备制造技术》 2016年第10期95-98,共4页 Equipment Manufacturing Technology
关键词 核电 万向摇臂钻 风钻 液压磁力钻 工装设计 nuclear power universal radial drilling pneumatic drill hydraulic magnetic drill tooling design
  • 相关文献

参考文献1

二级参考文献5

  • 1徐邦学.最新刀具设计制造与质量检验标准实用手册[M].长春:吉林音像出版社.2003.
  • 2GB/T4251-2004.硬质合金直柄机用铰刀[S].
  • 3GB/T4253-2004.硬质合金铰刀技术条件[S].
  • 4Hoganas Handbook For Sintered Components [Z] . HOGANAS CHINA CO.,LTD.2005.
  • 5包崇玺.烧结钢的切削加工性[A].全国粉末冶金学术及应用技术会议论文集[C].山东莱芜:中国机械工程学会粉末冶金分会.2005.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部