斜井盾构原位无扩大硐室地下拆解技术研究 被引量:4

Research of the Underground Disassemble Technique for Shield Machine in Inclined Shaft Without In-situ Expanding Cavern
下载PDF
导出
摘要 盾构斜井地下原位无扩大硐室拆解受空间限制和地质条件等多种因素影响,无法直接使用大型吊装工具进行盾构拆解。为满足盾构在斜井地下有限空间内的安全、高效、快速拆解需要,必须开展盾构大型部件原位地下无扩大硐室拆解施工技术研究。因此,结合盾构施工斜井工程要求和盾构地下拆解施工条件,介绍了盾构大型关键部件进行完整拆解技术研究。 Shield inclined shaft underground dismantling without in-situ expanding cavern is affected by space and geological conditions and other factors. It cannot directly dismantle the large parts with lifting tool. In order to meet the safety efficient and rapid dismantling of shield machine in inclined underground finite space, research on disassemble construction technique of shield machine is carried out in inclined shaft without in-situ expanding cavern. Therefore, according to the construction requirement of inclined shaft engineering and shield underground dismantling construction conditions, the completion disassemble technology of large key parts for shield machine are studied.
作者 张社军
出处 《施工技术》 CAS 北大核心 2016年第22期39-41,共3页 Construction Technology
基金 国家科技支撑计划项目(2013BAB10B03)
关键词 盾构 斜井 地下拆解 原位无扩大硐室 shields inclined shaft underground disassemble in-situ expanding cavern
  • 相关文献

参考文献7

二级参考文献15

共引文献54

同被引文献38

引证文献4

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部