期刊文献+

±800kV/6 250A锡盟—泰州直流输电工程换流阀合成运行试验 被引量:9

Thyristor Valve Synthetic Operational Test of ±800kV/6 250A Ximeng-Taizhou UHVDC Project
下载PDF
导出
摘要 为满足锡盟—泰州±800 kV/6 250 A换流阀运行试验的要求,建立了新型合成试验回路。介绍了新型合成试验回路的主要特点及解决的主要难题,结合实际工程研究合成试验回路主要设备的参数选取,并以此参数进行了±800 kV/6 250 A换流阀的运行试验。试验结果表明,所研究的合成试验回路完全可以满足±800 kV/6 250 A换流阀运行试验要求,验证了换流阀设计的合理性及可靠性。 To meet the thyristor valve operation test requirements of the Ximeng-Taizhou ±800 kV/6 250 A project, a new-type synthetic test circuit is built. The main features of the test circuit and the principal problems that need to be addressed are introduced. The main equipment parameters of the synthetic circuit are investigated and used for the operation test of ±800 kV/6 250 A thyristor valve. The test result shows that the proposed synthetic test circuit can meet the operation test requirements of the ±800 kV/6 250 A thyristor valve, and the rationality and reliability of the thyristor valve design are verified.
出处 《中国电力》 CSCD 北大核心 2016年第11期20-24,69,共6页 Electric Power
基金 河南省重大科技专项资助项目(141100210100)~~
关键词 特高压 直流输电 运行试验 合成回路 ±800kV/6250A 换流阀 UHV DC transmission operation test synthetic circuit ±800 kV/6 250 A thyristor valve
  • 相关文献

参考文献8

二级参考文献81

共引文献111

同被引文献92

引证文献9

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部