摘要
为满足锡盟—泰州±800 kV/6 250 A换流阀运行试验的要求,建立了新型合成试验回路。介绍了新型合成试验回路的主要特点及解决的主要难题,结合实际工程研究合成试验回路主要设备的参数选取,并以此参数进行了±800 kV/6 250 A换流阀的运行试验。试验结果表明,所研究的合成试验回路完全可以满足±800 kV/6 250 A换流阀运行试验要求,验证了换流阀设计的合理性及可靠性。
To meet the thyristor valve operation test requirements of the Ximeng-Taizhou ±800 kV/6 250 A project, a new-type synthetic test circuit is built. The main features of the test circuit and the principal problems that need to be addressed are introduced. The main equipment parameters of the synthetic circuit are investigated and used for the operation test of ±800 kV/6 250 A thyristor valve. The test result shows that the proposed synthetic test circuit can meet the operation test requirements of the ±800 kV/6 250 A thyristor valve, and the rationality and reliability of the thyristor valve design are verified.
出处
《中国电力》
CSCD
北大核心
2016年第11期20-24,69,共6页
Electric Power
基金
河南省重大科技专项资助项目(141100210100)~~