软弱围岩隧道斜井转正洞设计与施工技术 被引量:2

Soft Rock Tunnel Shaft Cut into Tunnel Design and Construction Technology
下载PDF
导出
摘要 结合某隧道工程项目施工的具体情况,对隧道施工中涉及的斜井转正洞问题进行详细分析,并结合设计方案提出施工过程中需要注意的事项。该项目中,采用喇叭口形式的斜井转正洞方案可以使施工过程中由于交叉作业导致的安全隐患明显减少,同时,正洞初期支护时交叉口处对斜井产生的纵向推力可以利用断面的结构特点进行相应抵消,施工安全及效率均得到有效提升。 This paper combined with the specific circumstances of a tunnel project construction, the inclined hole positive problems in tunnel construction are analyzed, and combining with the design scheme put forward the need to pay attention in the construction process.In this project, the slope positive hole program bell form can make the security risks in the construction process due to cross operation resulted in an apparent decrease, at the same time, the vertical thrust is hole after excavation of the intersection of the slope can be offset by corresponding structural features of the cross-section of the construction safety and efficiency are effectively improved.
作者 白露
出处 《建筑技术开发》 2016年第11期54-55,共2页 Building Technology Development
关键词 隧道 斜井转正洞 喇叭口 门式小导洞 交叉段支护 tunnel slope positive hole horn small tunnel portal cross section support
  • 相关文献

参考文献5

二级参考文献16

  • 1岳云肖.黄草隧道大跨段施工技术[J].铁道建筑技术,2002(z1):16-18. 被引量:5
  • 2付国宏.7号斜井进正洞挑顶施工技术[J].铁道标准设计,2005,25(9):77-79. 被引量:33
  • 3TB 10601-2009高速铁路工程测量规范[S].
  • 4TZ214-2005客运专线铁路隧道工程施丁指南[S].
  • 5铁建设[2005]160号客运专线铁路隧道工程施工质量验收标准[S].
  • 6TB10304-2009铁路隧道工程施工安全技术规范[S].
  • 7隧道监控量测技术规程[S].北京:中国铁道出版社,2008.
  • 8关宝树.隧道施工要点集[M].北京:人民交通出版社,2003..
  • 9铁道第四勘察设计院.金沙洲隧道设计图,新建铁路广州枢纽新广州站及相关工程施工设计,武汉:2007.
  • 10中华人民共和国交通部.JTGD70-2004公路隧道设计规范[S].北京:人民交通出版社,2004.

共引文献52

同被引文献19

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部