摘要
本文结合从事城市轨道交通车辆基地室外综合管线设计及配合施工的经验,着重指出了综合管线设计及配合施工应注意的问题,如管井坐标标注、上盖开发管线标高与承台地梁关系、管井与轨道的关系等,对后续车辆基地室外综合管线设计有一定的借鉴意义。
Combined with the experiences of outdoor comprehensive pipelines design and coordination construction of urban rail transit depot, the paper presented the attentive problems such as the relations between tube well coordinate annotation, top cover development pipeline elevation and pile cap patand, and the relations between tube well and track in the phase of the comprehensive pipelines design and coordination construction. It could be served as a reference for outdoor comprehen- sive pipelines design of depot in the future.
出处
《铁道建筑技术》
2016年第10期120-123,共4页
Railway Construction Technology
关键词
车辆基地
室外综合管线
设计
depot
outdoor comprehensive pipeline
design