摘要
结合上海国际航运中心洋山深水港区四期工程的建设案例,分析总结综合管沟的设计要点,提出在自动化集装箱码头设置综合管沟的设计思路和存在问题,为类似工程提供参考。
Combined with Yangshan Deepwater Port Phase IV of the Shanghai International Shipping Center, the design points of the utility tunnel is analyzed and summarized. The design concept and some shortcomings of the utility tunnel in the automatic container terminal are presented. Some references for similar projects are advised.
出处
《港口科技》
2016年第11期18-21,共4页
Port Science & Technology