5Zhu Weibin, Ju Shijian, Xie Baofeng, Luo Weixiong. On the engineering and countermeasures of crossing the Pearl River with two used shield machines in Guangzhou metro Line 2. New Devopment in Rock Mechanics & Rock Engineering. N J, USA: Rinton Press, 2002 : 389 - 394.
6Maidi B., Herrenknecht M., Anheuser L.. Mechanised Shield Tunnelling. Ernst & Sohn, 1995.
7Jancsecz, Krause, Langmaack. Advances of soil conditioning in shield tunnelling. 1999.
8竺维彬 鞠世健.盾构施工泥饼(次生岩块)成因及对策.地铁科技,2002,(4).
9June Luis Magro,Latest Development in Hard Rock Tunneling[ C], Sino- German Symposium on Shield Tunneling 2004,collection of Papers for the Symposium July,2004