7[2]Li Bing.The allocation of risk in PPP/PFI construction projects in the UK[J].International Journal of Project Management 23(2005):25-35.
8[4]Thue D N,Jennings N R.Concurrent bi-lateral negotiation in agent systems.14th International Workshop on Database and Expert Systens Applications[C].Prague,IEEE,2003:839-844.
9Tiong RLK and Alum J. Final negotiation in competitive BOT tender [J]. Journal of Construction Engineering and Management, 1997, 123(1): 6-10.
10Rahman MM and Kumaraswamy MM. Risk management trends in the construction industry: moving towards joint risk management[J]. Engineering Construction and Architectural Management, 2002(2): 131-151.