通过工程实例,分析了钢筋混凝土圆形落煤塔在抗震区筒内满载,筒外一侧堆满煤,另一侧煤全部卸完的情况下,筒壁根部的结构设计计算,内力和配筋计算通过手算完成,最后用Sap2000建模分析与人工手算结果进行比较,发现二者非常接近,验证了工程计算理论的可靠性。
In this paper, analysis of the reinforced concrete circular coal tower in the earthquake zone with cylinder, cylinder side filled with coal, structure design and calculation of the cylinder wall on the other side of the root of coal removed after the case, through the hand to complete the calculation of internal force and reinforcement, and using SAP2000 modeling analysis and manual calculation results comparison, found very close to two, to verify the reliability of engineering calculation theory.
出处
《工程建设与设计》
2016年第12期52-54,共3页
Construction & Design for Engineering
关键词
落煤塔
计算
结构设计
配筋
coal faUingtower
calculation
structure design
reinforcement