期刊文献+

基于PowerBuilder的矿山井下车间成本MIS的开发

Development of Cost Management MIS for Underground Mining Workshops Based on PowerBuilder
下载PDF
导出
摘要 利用PowerBuild 7.0和SQLServer 2 0 0 0开发了金山店铁矿井下车间的成本管理系统 ,该系统具有数据查询、表格生成、分析统计、图表显示等功能 ,已成功投入使用。本文介绍了开发思想、开发工具、系统实现 ,并介绍了开发过程中编程的关键技术。 Based on PowerBuilder 7.0 and SQL Server 2000, a cost management information system has been developed for the underground mining workshop of Jinshandian Iron Mine. The cost management MIS has functions of featuring data inquiring, form building, statistics analyzing and graph displaying, and has been put to use successfully. This paper presents the development conception, development tools, implementation of the system along with the key programming techniques adopted in the development process.
机构地区 东北大学
出处 《矿业研究与开发》 CAS 2002年第4期33-35,42,共4页 Mining Research and Development
关键词 POWERBUILDER 矿山 井下车间 MIS 成本管理 开发工具 数据库 编程技术 Cost Management MIS,Development tool,Data base,Programming techniques
  • 相关文献

参考文献4

  • 1温为民 李勇.PowerBuilder7.0实例学习指南[M].机械工业出版社,1999,9..
  • 2金劲,唐勤.决策支持系统-企业MIS的最终实现目标[J].电讯技术,1998,38(6):63-67. 被引量:4
  • 3李香民 徐进 等.SQL Server 2000 Programmer's Guide编程员指南[M].北京:希望电子出版社,2000..
  • 4柴佩琪 赵化民 等.微机管理信息系统大全(第1册)[M].西安:陕西科学技术出版社,1986..

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部