摘要
首山变电站是辽阳公司第一座220k V变电站,始建于1950年,首山220k V变电站最近一次改造为2012年,66k V设备更换为HGIS,但220k V设备一直未进行改造,运行设备普遍寿命达25年,需进行改造,该变电站负荷大,负荷转带困难,方式安排复杂。本文对改造期间检修方式安排进行研讨与分析。
The first mountain substation Liaoyang company first 220kV substation, built in 1950,the first mountain 220kV substation last renovation in 2012,66kV equipment replaced HGIS,but the device has not been 220kV transformation,universal life of operating equipment 25 years, the need to transform the substation load,load transfer belt difficult way to arrange complex.In this paper,during the renovation and maintenance mode to discuss arrangements for analysis.