期刊文献+

闸堰测控一体化系统在扬水灌区的应用研究 被引量:6

Study on the Application of Integrated Automatic Measurement and Control System of Gates and Weir for Trunk Straight Opening Flow in Pumping Irrigation Area
下载PDF
导出
摘要 以盐环定扬水工程为例,介绍了引进的直开口闸门测控一体化系统结构组成及建设内容,从测流准确性、闸门反应时间、开度准确性、可靠性等方面对干渠直开口闸堰测控一体化系统运行情况进行评估,结果表明:系统自动测定的水深误差为-5.83%-3.75%,日累计水量误差为-5.63%-0.64%,系统反应时间为0.4-1.0 s,开度误差为-2.67%-2.86%,各参数误差均在允许范围内,综合评估认为该系统功能全面,运行可靠,数据准确,可在明渠输配水工程中应用并推广. It will be a trend for water conservancy information management using the integrated automatic measurement and control system of gates. This article described the composition,building content and functionality of the system. Taking Yan-Huan-Ding Yellow River Pumping Project in Ningxia as an example,it evaluated the operation according to the flow measurement accuracy,gate reaction time,opening accuracy,reliability and other indicators. The main conclusions show that using this system,the error of water level is-5.83%-3.75%,the cumulative volume error is-5.63%-0.64%,the system response time is 0.4-1.0 s and the open error range is-2.67%-2.86%,so each parameter error is within the allowable range. Meanwhile,the comprehensive assessment is that the system has a comprehensive functions,reliable operation and accurate data characteristics. It can be widely used in open-channel irrigation water transportation and distribution engineering projects.
出处 《人民黄河》 CAS 北大核心 2016年第12期144-148,共5页 Yellow River
基金 国家重点研发计划课题(2016YFC0400206) 水利部公益性行业科研专项(201301095)
关键词 测控一体化系统 供用水管理 扬水工程 宁夏 automatic measurement and control system water supply management Yellow River Pumping Project Ningxia
  • 相关文献

参考文献7

二级参考文献37

共引文献47

同被引文献55

引证文献6

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部