摘要
针对湖溪水电站已运行了20余年,主要设备严重老化、落后,无法满足安全、高效运行要求的实际情况,本文介绍了湖溪水电站增效扩容改造设计。结果表明,改造设计能有效利用水资源,消除安全隐患,增效显著。
After the operation over 20 years, the main equipment in Huxi hydropower station is in a serious aging situation with low efficiency and high security risk. Under this circumstance, a reconstruction plan on efficiency increase and capacity expansion of Huxi hydropower station is proposed. It turns out that in this case the reconstruction can effectively improve the water resources, reduce the security risk and also increase efficiency greatly.
出处
《湖南工业职业技术学院学报》
2016年第5期11-13,共3页
Journal of Hunan Industry Polytechnic
关键词
湖溪水电站
增效扩容
改造方案
Huxi hydropower station
efficiency increase and capacity expansion
reconstruction project