期刊文献+

察哈素煤矿大采高综采工作面宽度优化模拟分析 被引量:1

Numerical simulation and optimal analysis on the width of fully-mechanized mining face in Chahasu coal mine
下载PDF
导出
摘要 工作面长度是采煤工艺的重要参数,为实现高效高产开采,察哈素煤矿计划采用超长工作面进行回采。结合察哈素煤矿具体生产及地质情况,分析矿山压力显现对不同长度工作面的影响,采用数值模拟的方法确定回采工作面的合理长度,供实际中参考使用。研究结果表明,工作面的合理宽度为300m。 The width of coal mining face is one of important parameters for the mining technology, in order to realize high mining technique, the mining experiment of great-height and supper-long faces is scheduled in Chahasu coal mine.Combined with the detail geological and mining conditions of No.31 working area in Chahasu coal mine, the effect of the strata pressure behavior on different width of mining face has been analyzed, and the reasonable mining width of the working face was determined as a reference of the practical using by numerical simulation method. The study result shows that the reasonable mining width of the working face was 300m.
作者 智强 孙中光 张刚洲 Zhi Qiang Sun zhong-gung Zhang Gang-zhou(Chahasu Coal Mine,State Power Construction Investment Inner Mongolia Energy Co.,Ltd.,Erdos ,017209 China Coal Technology Engineering Group Chongqing Research Institute, Chongqing, 400039)
出处 《山东煤炭科技》 2016年第12期27-29,共3页 Shandong Coal Science and Technology
关键词 大采高 综采 数值模拟 矿压 large mining height fully numerical simulation mine pressure
  • 相关文献

参考文献2

二级参考文献4

  • 1徐永圻.煤矿开采学[M].徐州:中国矿业大学出版社,2001.
  • 2乌荣康.高效高产矿井现状及发展趋势[C].中国煤炭工业协会,1998.
  • 3王玉浚.合理工作面长度的判别标志[J].中国矿业学院学报,1984(4):26-33.
  • 4欧林山.影响采煤机开机率的主要因素及对策[J].煤炭科技,2002,23(3):12-13. 被引量:5

共引文献5

同被引文献4

引证文献1

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部