摘要
随着唐口煤矿南部区域的不断开拓,长距离供风造成供风不足,需要对原通风系统进行均衡通风优化研究。首先,对唐口煤矿进行了通风阻力测定。在此基础上,对南风机挂网后南北翼分区通风问题进行了研究。最后,对维持南北翼风量均衡性的日常监控管理提出了建议。
With the excavation of Tangkou mine in the southern region, long distance ventilation resulting in insufficient air supply, a optimization study on the balance of original ventilation systems is proposed. First, Tangkou mine ventilation resistance were measured, On t-his basis and after hanging on the south fan, and the balanced ventilation problems of north and south wings have been studied. Finally, the daily monitoring and management recommendations on the north and south wings to maintain air flow balance was put forward.
作者
侯国培
王岳
Hou Guo-pei Wang Yue(Shandong Tangkou Coal Co., Ltd., Shandong Ji'ning 272055 College of Mining and Safety Engineering, Shandong University of Science and Technology, Shandong Qingdao 266590)
出处
《山东煤炭科技》
2016年第12期74-75,共2页
Shandong Coal Science and Technology
关键词
唐口煤矿
通风系统
阻力测定
网络解算
均衡通风
Tangkou mine ventilation systems
resistance measurement
network solution
balanced ventilation