摘要
针对红旗煤矿下组煤的地质条件,通过选择合适的三维地震勘探观测系统和数据处理方式,有效地提高了地震时间剖面信噪比,取得了很好的实践效果。
According to the geological conditions of under-group coal seams in HONGQI coal mine, to select the appropriate 3D seismic observation system and data processing method, effectively improved the signal-to-noise ratio of seismic section, achieved good results in practice.
作者
李京涛
Li Jing-tao(Shandong Province Coal Geology Bureau, Shandong Ji'nan 250104)
出处
《山东煤炭科技》
2016年第12期152-153,157,共3页
Shandong Coal Science and Technology
关键词
三维地震
薄煤层
构造
陷落柱
3D seismic
thin coal seam
structure
collapse column