摘要
通过文献分析将逾期竣工违约金的确定问题分解为违约金的约定和约定过高情况下的调整两个方面;分析发包人在约定逾期竣工违约金时应考虑的因素及约定的两种方式,具体研究不同方式下违约金金额的确定。最后,通过整理相关法律文件明确约定过高情况下逾期竣工违约金调整的两个基本原则,并据此将逾期竣工违约金的调整分为实际损失可计量与不可计量两种情况并作具体考虑。
Firstly,the paper decomposes the determination of penalty for overdue completion into two aspects about engagement and adjustment of default penalty.Secondly,analyzes the various factors of engagement,and through analysis of engineering contracts,gets two common ways of engagement and studies the determination of the amount of default penalty in different ways.Lastly,establishes two basic principles of adjustment through legal documents analysis,and divides adjustment into two cases according to whether the loss can be measured based on two principles.
出处
《建筑经济》
2016年第12期68-72,共5页
Construction Economy
基金
国家自然科学基金项目"PPP项目中信任的动态演化机理研究:基于政府部门视角"(71372110)
教育部人文社会科学研究青年基金项目"PPP项目合同柔性影响再谈判机理研究:基于参照点效应"(15YJC630082)
关键词
13合同范本
逾期竣工
违约金约定
违约金调整
construction contract(2013)
overdue completion
engagement of delault penalty
adjustment of default penalty