期刊文献+

长宁区块目标法优化钻井技术

OBJECTIVE METHOD USED TO IMPROVE DRILLING AT CHANGNING BLOCK
下载PDF
导出
摘要 长宁区块页岩气勘探开发是国家"十二五"规划的重点项目,长宁H3平台是中国第一个页岩气平台井。在页岩气钻井中,由于每口井、每个平台投资巨大,因此总结出合理高效的提速方法尤为重要。通过分析该平台每口井的钻井参数并加以研究,从中总结出一套合理的钻井参数以减少钻井作业中起下钻趟数,提高行程钻速的数学模型,从而最终达到用理论来指导实践,帮助长宁区块页岩气钻井平台减少投入,增加产出的目的。 Shale gas exploration and development at Changning block a key project of the national ' 12 th Five-Year' plan.Cliangning H3 platform is the first Chinese shale gas drilling platform.In shale gas drilling,the investment on each well or each platform is huge,to find a reasonable effective ROP improvement method is particularly important.By studying the drilling parameters of each well on this platform,a set of reasonable drilling parameters were determined to reduce trips and a model set up to improve ROP.Ultimately the theory can be used to guide actual practice,helping to reduce investment on shale gas drilling platforms at Cliangning block,and increase output.
出处 《钻采工艺》 CAS 北大核心 2016年第6期18-20,共3页 Drilling & Production Technology
基金 中国石油天然气集团公司科技重大专项"页岩气丛式水平井开发钻完井配套技术"课题(编号:2011D-4403)
关键词 长宁 页岩气 目标法 钻井提速 PDC钻头 参数控制 Changning shale gas objective method ROP improvement PDC bit parameter control
  • 相关文献

参考文献5

二级参考文献25

共引文献99

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部