基于FLAC3D的桩端后注浆桩沉降特性研究 被引量:2

Research on Settlement Characteristics of Pile-end Post-grouting Pile Based on FLAC3D
下载PDF
导出
摘要 以长平高速公路K94+920.9通道桥改扩建工程为依托,运用FLAC3D软件进行数值模拟,对桩端后注浆桩的沉降特性进行了研究。结果表明:进行桩端后注浆后,桩端土的承载能力得到了很大改善,桩顶沉降较普通桩各级荷载下的沉降减小约40%,计算结果与现场实测结果较吻合。 Based on Changping Expressway Passage Bridge (K94 +920. 9) Expansion Project, the FEAC3D software was adopted to make numerical simulation and study the settlement characteristics of pile-end post- grouting pile. The results show that, after pile-end post-grouting, the bearing capacity of the pile end soil has been greatly improved, the settlement of pile top is about 40 % smaller than that of ordinary pile at all levels of loads. The calculated results are consistent with the field test results.
出处 《路基工程》 2016年第6期129-133,共5页 Subgrade Engineering
基金 吉林省交通科技计划项目:钻孔桩桩端后注浆技术应用研究(2011-1-11)
关键词 通道桥 桩端后注浆 沉降量 沉降特性 数值模拟 passage bridge pile-end post-grouting settlement amount settlement characteristics numerical simulation
  • 相关文献

参考文献12

二级参考文献90

共引文献328

同被引文献28

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部