核电工程的设备采购不符合项管理,不但直接影响到设备的质量,而且影响到核电工程建设的进度、费用等方面,为保障设备的质量及后续工程建设的顺利进行,必须加强设备采购过程中的不符合项管理。针对目前越来越普遍的项目总承包管理模式,应根据EPC总承包模式的采购特点,采取适宜的管理方法对不符合项进行控制,保证质量的同时且能够兼顾效率,为核电项目提供优质、高效的采购服务。
The equipment procurement non-conformance control of nuclear power project not only directly affect the quality of the equipment,but also affect the nuclear power project construction schedule,cost,etc.,in order to guarantee the quality of the equipment and the subsequent project construction smoothly,it must strengthen the item does not conform to the management in the process of equipment procurement. In view of the present project general contracting management model is becoming common,we should be based on the characteristics of EPC general contracting mode of procurement to take appropriate management methods,made sure of quality assurance then efficiency,then to provide quality and efficient procurement services for nuclear power project.
出处
《工程质量》
2016年第11期89-91,共3页
Construction Quality
关键词
不符合项
采购
核电设备
总承包
non-conformance term
procurement
nuclear power equipment
general contracting