摘要
为了解决青海宠扬水公司4000t/d生产线烧成系统存在的生产线运转率偏低、烧成系统热耗偏高、出C1筒温度偏高等问题,对系统进行了技术改造,取得了较好的效果,达到了节能降耗的改造目标。
In order to solve the problems of low operation rate, high heat consumption of burning system and high temperature of C 1 tube of the 4 000 ffd clinker production line, reform the system technically and achieve better effect, reaching the target of energy sav- ing transformation.
出处
《水泥工程》
CAS
2016年第6期39-40,46,共3页
Cement Engineering
关键词
技术改造
节能降耗
热耗
入窑分解率
高海拔
technical transformation
energy saving and consumption deducing
decomposition rate of the kiln
high elevation