详细介绍了恋思水库溢洪道桥板的预制,在预制过程中场地的选择、橡胶气囊的安装及现场混凝土的质量控制,在桥板吊装过程中吊装顺序、吊装安全及其它注意事项。
The paper details precasting bridge slabs of the traffic bridge on Liansi Reservoir's spillway,the selection of precasting site in the precasting process,installing the air bag,the concrete quality control in construction site,the hoisting order of the bridge slabs in lifting process,hoisting safety and other matters needing attention.