脱硫吸收塔入口烟道泄漏原因分析及对策 被引量:4

Reason analysis of frequent leakage of FGD inlet duct and its countermeasures
下载PDF
导出
摘要 针对超临界机组烟气脱硫吸收塔入口原烟道的腐蚀特点、成因分析,提出了对吸收塔入口原烟道频繁泄漏问题的解决办法和具体的处理措施。通过对各种防腐材料和防腐工艺的选择对比、得出选择合金内衬作为吸收塔入口原烟道防腐层是最佳选择。 In view of the corrosion characteristics and cause analysis of the flue gas desulfurization absorption tower in the supercritical unit, the solution method and the specific measures to solve the problem of frequent leakage in the entrance of the absorber tower are presented. By choosing the best choice of the lining of the absorption tower as the entrance to the absorption tower, the selection of the various anti - corrosion materials and anti- corrosion technology is compared.
作者 严瑞锋
出处 《电力科技与环保》 2016年第6期30-31,共2页 Electric Power Technology and Environmental Protection
关键词 烟气脱硫 吸收塔 原烟道 防腐工艺 合金内衬 flue gas desulfurization absorption tower original flue anti - corrosion process alloy lining
  • 相关文献

参考文献3

二级参考文献18

  • 1赵鹏高,严晨敏,潘超.二氧化硫排放总量控制若干问题的思考[J].电力环境保护,2006,22(4):1-3. 被引量:8
  • 2乔光辉 等.玻璃钢在烟气脱硫装置中的应用[Z].中国环境科学学会.二氧化硫污染治理技术汇编[C].,2000.66-71.
  • 3国家环保总局.关于印发华能集团公司等电力企业现役燃煤机组“十一五”重点烟气脱硫工程项目单及二氧化硫总量削减目标责任书的通知[Z].环函[2006]239号,2006-06-16.
  • 4上海市人民政府办公厅.上海市人民政府办公厅转发市发改委等六部门关于市“十一五”期间燃煤电厂脱硫工程实施方案的通知[Z].沪府办[2006]6号,2006-02-17.
  • 5王志轩.我国燃煤电厂二氧化硫排放控制问题分析[C].火电厂环境保护综合治理技术研讨会论文集.南京:2006.
  • 6舒惠芬.环保设施要节约,环保技术要创新[C].火电厂环境保护综合治理技术研讨会论文集.南京:2006.
  • 7朱法华.电力工业与环境保护[C].火电厂环境保护综合治理技术研讨会论文集.南京:2006.
  • 8高小春.石灰石-石膏湿式脱硫常见设备故障及对策探讨[C].全国电力行业脱硫脱硝技术协作网暨年会技术研讨会论文集.武汉:2008.
  • 9杨道武,朱志平,李宇春.Analysis and Discussion on the Principle and Application of FGD Technology in Coal-fired Power Plant[ C]. Proceedings of the EnerEnv'2003 Conference,2003,10:651-654.
  • 10许红,张燕榕,王臣.火电厂烟气脱硫工艺的选择[J].煤炭加工与综合利用,2007(5):45-48. 被引量:5

共引文献14

同被引文献43

引证文献4

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部