以华能澜沧江水电股份有限公司糯扎渡水电厂为例,介绍了大型水电机组顶盖取水试验的措施和方法,在试验过程中解决了一些难题,使试验取得了成功,可为同类机组开展相关试验提供参考。
Take Huaneng Lancangjiang Hydropower Company Limited Nuozhadu Hydropower Plant as an example,the method to take water sample from hydropower plant utility-type unit top cover was indicated. Difficulties during experiment was overcome. Which could be referred by similar experiment.