摘要
文中就桥式起重机主端梁拼装节点的设置原则、计算方法以及制造和安装步骤进行了详细的阐述。根据工程实际提出了设计和安装时需要重视的几个问题。
The paper details the setting principles of assembling nodes of the main beam of the overhead crane, calcu- lation methods, and manufacture and installation procedures. Furthermore, several problems to be concerned during design and installation are put forward according to engineering practice.
出处
《起重运输机械》
2016年第12期112-114,共3页
Hoisting and Conveying Machinery
关键词
桥式起重机
金属结构
拼装节点
设计
安装
overhead crane
metal structure
assembling node
design
installation