摘要
合理设置城市轨道交通换乘站的设备系统,不仅能提高换乘站的运营管理水平,而且能有效避免设备系统重复投资。介绍了换乘站设备系统资源共享的内容;对换乘站换乘类型、运营管理模式及建设时序等影响资源共享的因素进行了分析;提出了3种换乘站设备系统资源共享总体方案,并从可靠性、经济性、运营管理方便性等方面对相关系统的各具体方案进行了对比分析,提醒出相应的建议。
Reasonable setting of the equipment system at urban rail transit transfer station can not only improve the operation management level, but also avoid repeated investment in equipment system. Firstly, the resource sharing of equipment system at transfer station is briefly introduced, the influencing factors of resource sharing, such as transfer types, operation management modes and construction sequences of transfer station are analyzed;secondly, three resource sharing schemes of equipment system at transfer station are proposed and comparatively analyzed respectively from aspects of reliability, economic efficiency and convenient operation management; finally, corresponding recommendations are proposed.
出处
《城市轨道交通研究》
北大核心
2016年第12期101-105,共5页
Urban Mass Transit
基金
江苏省科技厅产学研联合创新基金项目(BY2012497)
南京地铁专项科技项目(8550140042)
关键词
城市轨道交通
换乘站
设备系统
资源共享
urban rail transit
transfer station
equipmentsystem
resource sharing