摘要
总结了近10多年来南京地铁建设过程中出现过的安装接口问题和车辆与信号接口问题,梳理了需要在设计阶段注意的接口事项,提出了解决途径和建议。
The main problems related to interfaces between vehicle and signaling system during the subway construction in Nanjing City in the past 10 years are summarized, key points in the design phase of subway interfaces are emphasized, solutions and suggestions are proposed.
出处
《城市轨道交通研究》
北大核心
2016年第12期119-122,共4页
Urban Mass Transit
关键词
城市轨道交通
车辆
信号
接口
urban rail transit
vehicle
signaling
interface