期刊文献+

装配预制连续梁抗剪性能分析

Analysis on Shear Resistance Capacity of Assembly Prefabricated Continuous Beams
原文传递
导出
摘要 为分析装配预制连续梁的斜截面抗剪性能,采用两点对称加载方式对3根钢筋混凝土连续梁进行抗剪承载力试验。分析企口现浇装配预制连续梁新旧混凝土的连接性能,对比分析整浇连续梁与装配预制连续梁的裂缝开展趋势、斜截面破坏形态、极限承载能力、荷载-纵筋和荷载-箍筋应变变化规律以及变形能力。结果表明:在加载过程中,装配预制连续梁接口区域内,裂缝延伸较快,截面刚度有所削弱,但斜截面抗剪承载力特征和变形能力与整浇连续梁相似,开裂荷载和极限荷载与整浇连续梁基本相同。 In order to analyze the shear resistance capacity of the diagonal section of assembly prefabricated continuous beams, the experiment of the shear bearing capacity of three reinforced concrete continuous beams was carried out by using two-point symmetrical loading. The performance about connectivity of old concrete interface of the assembly prefabricated continuous beams was analyzed, a test was conducted to study the crack development trend,inclined section failure mode,ul- timate bearing capacity, load of longitudinal reinforcement, load stirrup strain variation, deformation capacity of the whole cast continuous beams and the assembly prefabricated continuous beams. The results show that:during the load process, in the interface areas of assembly beams, cracks extend rapidly with weakening in section stiffness, but the shear resistance of the diagonal section and deformation capacity of assembly beams are similar with the whole pouring beam, the cracking load and ultimate load with the whole pouring contrast beam are basically the same.
出处 《世界科技研究与发展》 CSCD 2016年第6期1151-1154,1193,共5页 World Sci-Tech R&D
基金 辽宁省科学事业公益研究基金(2015004019) 中国煤炭工业协会科学技术研究指导性计划(MTKJ2014-199)资助
关键词 装配预制连续梁 极限承载力 破坏形态 挠度 应变 assembly prefabricated continuous beam ultimate bearing capacity failure mode deflection strain
  • 相关文献

参考文献8

二级参考文献114

共引文献235

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部