期刊文献+

鄯科1井二级三段固井工艺 被引量:3

DOUBLE-STAGE THREE-SECTIONAL CEMENTING TECHNIQUE IN WELL SHANKE-1
下载PDF
导出
摘要 鄯科 1井是 1口科学探索井 ,实际二次中完井深 4 6 4 6m。该井三开钻井过程中 ,井下出现了坍塌、掉块、井漏、油气活跃等复杂情况 ,尤其是套管下完后的环空失返 ,给固井施工带来了很大的困难。通过制定解漏方案 ,采用了二级三段固井工艺技术 ,并优选了 3种水泥浆配方 ,优化了水泥浆性能 ,使井建立了循环。施工中 ,下部井段第 1级固井正注水泥 ,上部井段第 2级固井先正注、后反注水泥。测试表明 ,固井质量达到了设计要求 。 Well Shanke 1 is a scientific exploration well, and its intermediate completion depth is 4646m. During drilling of the third section, such troubles as hole collapse, wall slabbing, lost circulation and oil gas activities occurred, especially the problem of annular return lost after casing running, caused great difficulties for cementing operations. By programming a suitable plugging plan, applying the double stage three sectional cementing technique, and optimizing three types of cement slurry formulations and their performances as well, well circulation was established once more. The first stage bottomhole section applied conventional cement job, and the upper second stage applied conventional cement job first, and then the reverse cement job. Logging results showed that the cementing quality met the designed requirements, and set the foundation for safe drilling of the fourth section.
出处 《石油钻采工艺》 CAS CSCD 北大核心 2002年第4期13-15,82,共3页 Oil Drilling & Production Technology
关键词 鄯科1井 二级三段固井 工艺 油气井 井漏 设计 施工 well Shanke 1 cementing lost circulation design operation
  • 相关文献

同被引文献7

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部