厦门市轨道交通2号线二期工程是一条新修的线路。为了确保工程如期完成,文章分析了工程重难点,据此提出了施工工期对策。
The Second Phase Project of Xiamen Metro Line 2 is a new line.In order to ensure the completion of the project on schedule, this paper analyzed the key and difficult point s of the project, and put forward the countermeasures of construction period.