期刊文献+

考虑关联性的电网建设项目经济效益后评价研究 被引量:14

Post-Evaluation of Economic Benefits of Power Grid Projects with Consideration of Relevance
下载PDF
导出
摘要 电改环境下电网公司需要以更加市场化的眼光评价已建成电网建设项目的经济效益,以为同类建设项目提供管理决策支持。提出电网项目经济效益后评价模型,从相互关联的建设成本、财务效益、社会经济效益和环境影响成本4个方面构建网络层次结构指标体系,运用ANP方法求解相互关联的指标权重,引入犹豫语言评语方法为决策者服务,通过云模型集结各指标评价结果,并利用辽宁省已建成的电网建设项目为案例,验证了模型的合理性和可行性。 In the context of electric power system reform, power supply companies have to estimate the economic performance of the constructed power grid projects with a more market-oriented perspective so as to provide a support for management decision-making of similar construction projects. An economic benefits post-evaluation model is proposed for power grid projects and an index system with network hierarchy is built which consists of such four relevant factors as construction costs, financial benefit, social benefit, economic benefit and environmental impact costs. The ANP method is applied to solve the weight of relevant index, and the hesitant language evaluation method is introduced to serve the policymakers. Finally, the cloud model is used to assemble every index evaluation result. Three power grid construction projects built in Liaoning province are used to verify the feasibility and rationality of the proposed model.
作者 乌云娜 范亮 陈开风 WU Yunna FAN Liang CHEN Kaifeng(Institute of Project Management of North China Electric Power University, Beijing 102206, China)
出处 《中国电力》 CSCD 北大核心 2016年第12期156-161,共6页 Electric Power
关键词 电网 项目管理 经济效益后评价 关联性 犹豫语言 power grid project management economic benefits post-evaluation relevance hesitant language
  • 相关文献

参考文献16

二级参考文献127

共引文献340

同被引文献100

引证文献14

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部