摘要 青龙湾大桥全长2.304km,桥梁全长1 307m,其中浅海段1 104m,主桥是(60+100+60)m三跨连续变截面箱梁,引桥是40m跨径的先简支后连续预制小箱梁桥。在大桥施工前对整桥控制网进行复测和加密,然后根据工程对导线精度的要求,布设相应的闭合导线或附合导线。着重讲述了在施工环境复杂、精度要求高、海洋气候恶劣的情况下对跨海大桥的测量控制及关键测量技术。 The length of Qinglong Bay Bridge is 2. 304 km,bridge length is 1 307 m,where the shallow segment is 1 104 m,the main bridge is 60 + 100 + 60 meters three-span continuous uniform box girder bridge. The supported bridge is a 40 meters span prefabricated girder bridge. Before the bridge construction,the whole bridge control network are retested and encrypted,and then based on the requirement of wires accuracy,the closed wine connecting wires are arranged. Combining with complex environment in the construction, high precision requirement, the harsh weather conditions, the measurement control and key measurement technology is introduced.
作者 马晓平 孙健 潘龙 蒋勇 Ma Xiaoping Sun Jian Pan Long Jiang Yong(China Construction Sixth Engineering Division Bridge Co. , Ltd. , Chongqing 402260, Chin)
出处 《施工技术》 CAS 北大核心 2016年第24期42-43,共2页 Construction Technology
基金 中建股份科技研发课题(CSCEC-2014-Z-21)
关键词 桥梁工程 海上测量 工程测量 控制测量 测量方法 控制网 bridges marine surveying engineering surveying control surveying surveying methods control network
  • 相关文献

参考文献6

二级参考文献17

  • 1傅新军,崔巍.EDM三角高程测量在大型桥梁中的应用[J].现代测绘,2007,30(3):16-18. 被引量:7
  • 2JTJ/T 066-98,公路全球定位系统(GPS)测量规范[S].
  • 3GB50026-93.工程测量规范[S].[S].,..
  • 4GB12897-91.国家一、二等水准测量规范[S].[S].,..
  • 5孔祥元 梅是义.控制测量学[M].武汉:武汉测绘科技大学出版社,1996..
  • 6GB/T18314-2001.全球定位系统(GPS)测量规范[S].[S].,..
  • 7周忠漠,易杰军.GPS卫星测量原理与应用[M].北京:测绘出版社,1992.
  • 8国家测绘局.全球定位系统(GPS)测量规范[M].测绘出版社,1992.
  • 9杭州湾大桥工程指挥部.杭州湾跨海大桥专用施工技术规范[S].2005.
  • 10铁建设[2006]189号,客运专线无碴轨道铁路工程测量暂行规定[S].

共引文献9

同被引文献10

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部