摘要 朝阳隧道处于东北寒冷地区,气候条件极其恶劣。为保证整个工程的施工进度和工程质量,必须采取冬期施工。在以往工程的施工经验基础上,结合当地气候特点,在经过实际应用与科学研究基础上,优化了料仓保温实施方案,并提出了寒冷地区隧道施工混凝土配合比方案,即保证了隧道冬期施工的顺利进行,又为其他寒冷隧道施工提供参考。 Chaoyang tunnel locates in the northeast cold region where the weather conditions are extremely bad. In order to ensure the construction progress and quality of the whole project,winter construction must be taken. In the previous construction experience,combined with the local climate characteristics,based on the practical application and scientific research on the optimization of the heat preservation silo project,the cold area tunnel construction scheme of concrete mix proportion is put forward,which ensures the smooth construction of the tunnel in winter,and provides a reference for other cold tunnel construction.
作者 孙国鹏 王彪 肖泽天 Sun Guopeng Wang Biao Xiao Zetian(China Construction Sixth Engineering Division Bridge Co. , Ltd. , Chongqing 402260, Chin)
出处 《施工技术》 CAS 北大核心 2016年第24期97-100,共4页 Construction Technology
关键词 公路工程 隧道 寒冷地区 冬期施工 防寒保温 road construction tunnels cold area winter construction cold insulation
  • 相关文献

参考文献8

二级参考文献51

共引文献113

同被引文献48

引证文献5

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部