摘要
对甲乙两个赤铁矿选矿厂项目的初步设计概算做静态投资分析比较,乙项目的单位原矿投资为甲项目的两倍,分析其原因是甲项目单位处理量投资比乙项目高,除不可避免的价格因素,建议业主加强施工管理和招标采购工作来降低工程造价。
The paper conducts static investment analysis comparison for the preliminary design budget estimation of two hematite beneficiation plants A and B. the raw ore investment per unit of Project B is twice as much as that of Project A. The analysis on its reasons is that the investment of unit handling capacity of Project A is higher than that of Project B. Except the unavailable price factors, it suggests the Owner strengthening construction management and tendering and procurement works to reduce project costs.
出处
《矿业工程》
CAS
2016年第6期1-2,共2页
Mining Engineering
关键词
赤铁矿
选矿厂
投资
hematite
beneficiation plant
investment