摘要
将着手于不同类型分布式电源接入配网的等效模型,结合特定潮流计算处理方案,利用改进的模拟植物生长算法对分布式电源接入配网之后在最优流模式下寻求新的生长点,然后确立配网重构时的目标函数,并利用此算法对建立的重构模型进行配网重构,而后对配网的整个节点进行可行性分析,以确保重构的可行性与优越性.
Based on the equivalent model in which different types of distributed power are integrated into the distribution network,as well as the specific flow calculation processing scheme,we used the improved plant growth simulation algorithm to seek new growing point in the optimal flow mode,and established the objective function when the distribution network is reconfigured.Then we used this algorithm to reconstruct the distribution network for the reconfiguration mode.Finally,we conducted a feasibility analysis of the en-tire distribution network nodes to ensure the feasibility and superiority of the reconstruction.
出处
《湖北民族学院学报(自然科学版)》
CAS
2016年第4期408-411,共4页
Journal of Hubei Minzu University(Natural Science Edition)
基金
湖北省自然科学基金计划项目(2013CFC125)
关键词
分布式电源
配电网
重构
前推回代法
模拟植物生长法
distributed power
distribution network
reconfiguration
forward-backward substitution meth-od
plant growth simulation method