摘要
针对江汉平原修建高速公路所面临的软基广泛分布、长江青砂资源丰富等特点,提出了填砂路堤大厚度填筑技术方案,砂料松铺厚度可由规范要求的30cm提升至70cm.通过现场碾压试验,并分3层检测砂料全厚度压实度,对比了3种不同碾压试验方案的压实效果及其均匀性,从中得出最佳压实参数.大厚度填筑技术相较于传统厚度填筑技术,在确保工程质量的前提下,可大幅度节省工期.
The study proposes a new technique of highway sand embankment filling in Jiang Han Plain,which can raise the thickness of sand filling layer from 30 cm to 70 cm.Both the degree and uniformity of sand compaction are checked based on the comparison among three compacting proposals carried out on the test field.In addition,the compaction parameters are optimized based on the field tests,which can ensure the quality of sand embankment construction and significantly shorten the construction period.
出处
《武汉理工大学学报(交通科学与工程版)》
2016年第6期998-1002,共5页
Journal of Wuhan University of Technology(Transportation Science & Engineering)
基金
湖北省交通运输厅2015年科技项目资助(2014-721-2-6)
关键词
道路工程
碾压工艺
大厚度施工
填砂路堤
江汉平原
road engineering
compaction
thicker filling construction
sand embankment
Jianghan Plain