深井复杂条件下矿石溜井施工技术 被引量:2

Construction technology of ore chute under complex conditions in deep mine
下载PDF
导出
摘要 阿舍勒铜矿50m~0m矿石溜井施工过程中面临深部高应力、围岩稳定性差等复杂条件,发生过两次垮塌事件;为了解决该矿石溜井施工困难问题,提出了一套切合现场实际的技术方案,并且顺利完成施工,工程质量良好,现场效果明显。该施工技术的成功实践,不仅为阿舍勒铜矿开采接替工作打下良好基础,而且为同类矿山中推广应用提供一定的科学依据与实践意义。 The Ashele copper 50m - 0m ore slip deep and high stress, such as poor stabihty of surrounding rock in complex conditions facing well construction in the process of collapse occurred two times; in order to solve the difficult problem of orepass construction technology, proposed a suit of the field, and the successful completion of the construction project quality good. The effect is obvious. The successful practice of the construction technology, not only for the Ashele copper mining succeed work lay a good foundation, but also provides scientific basis and practical significance for popularization and .application .of similar mines.
作者 丘永富
出处 《世界有色金属》 2016年第11期121-123,共3页 World Nonferrous Metals
关键词 深井 复杂条件 矿石溜井 施工技术 deep well complex condition ore chute construction technology
  • 相关文献

参考文献1

二级参考文献8

共引文献78

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部