期刊文献+

装车楼装车质量的综合治理 被引量:1

Comprehensive Measure on Loading Quality of Loading Station
下载PDF
导出
摘要 为了提高装车楼的装车质量,对装车楼的溜槽机构加装分料器和振动器,解决装车过程中的偏载和亏载的问题;改进装车楼控制程序,解决装车过程中超载和禁装车厢误装的问题。通过改造能基本解决装车楼装车过程中出现的各种问题,既满足铁路货物运输要求,又维护货主的利益。 In order to improve the loading quality of loading station, the distributor and the vibrator are installed on the chute mechanism of loading station to solve unbalanced loading and underload during the loading process. The problems of overload and mistaken loading for the carriage which is forbidden to load are solved with the improved loading station control procedure. The improvements largely solve the problems which are found in the loading process. The advantages are not only to meet the requirement of railway transport of goods, but also to safeguard the interests of cargo owner.
出处 《港口科技》 2016年第12期39-42,共4页 Port Science & Technology
关键词 港口 装车楼 装车质量 port loading station loading quality
  • 相关文献

同被引文献5

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部