摘要
在南水北调东线泗阳泵站工程建设中,通过优化混凝土施工方案,较好地解决了混凝土浇筑、质量控制等方面的问题,促进了工程进度。本文对该项目中混凝土施工技术的应用作了详细介绍。
Problems in the aspects of concrete pouring, quality control, etc.are better solved, and project progress is promoted through optimizing concrete construction plan in engineering construction of Siyang Pumping Station in east line of South-to-North Water Diversion Project.The application of concrete construction technology in the project is intraduced in detail in the paper.
出处
《水利建设与管理》
2016年第11期11-14,25,共5页
Water Conservancy Construction and Management
关键词
泗阳泵站
混凝土工程
施工技术
Siyang Pumping Station
concrete engineering
construction technology