天生桥1号调压井35米高钢模板加固处理施工技术措施

Reinforcement treatment construction technical measures of Tianshengqiao No.1 surge shaft 35m high steel template
下载PDF
导出
摘要 天生桥调压井35m高钢模板,经过多年使用已出现锈蚀、脱落现象,给机组长期运行带来安全隐患。本文介绍了天生桥调压井35m高钢模板加固处理成功的施工技术要点和安全风险控制措施,为类似项目实施提供一定借鉴作用。 Tianshengqiao No.1 surge shaft 35m high steel template has suffered from corrosion and falling phenomena after being used for many years, thereby leading to safety hidden danger to long-term operation of the unit.In the paper, construction technology keys and safety risk control measures of successful reinforcement treatment in Tianshengqiao No.1 surge shaft 35m high steel template are introduced, and it provides certain reference role for implementing similar projects.
出处 《水利建设与管理》 2016年第11期15-17,共3页 Water Conservancy Construction and Management
关键词 调压井 钢模板 加固 技术措施 surge shaft steel template reinforcement technical measures