期刊文献+

顶管钢管的壁厚设计及验算方法 被引量:5

Design and Calculation Method for Steel Pipe Wall Thickness by Jacking Installation
下载PDF
导出
摘要 采用顶管法施工的污水管道,管材如采用钢管,接头在工作井内焊接后顶进,钢管在顶进期间和使用期间的受力与钢筋混凝土承插管有很大区别。以力学原理为基础,根据钢管在顶进期间和运营期间的受力与变形特点,针对现行规范尚不完善之处,补充了施工期间的钢管应力计算方法和计算公式。对现行规范计算管道顶为黏性土时竖向土压力的计算公式提出了修正建议。给出了工程示例。 For steel pipe line which is welded joint to a line and launched by jacking method, the incurred stresses under launching and service period are quite different from precast reinforced concrete pipe. Based on machenics theories, accounting for the characteristics of surrounding forces on pipe and displacement of the pipe under jacking or service periods, the designer presents new method to calculate stresses, offers several formula. There are also modifications presented for the comtemprary design specification in transverse earth load calculation formula.
作者 陈继光 曲研 Chen Jiguang Qu Yan(Guangdong Metallurgical and Architectural Design Institute, Guangzhou 510080, Guangdong, China)
出处 《岩土工程技术》 2016年第6期271-274,285,共5页 Geotechnical Engineering Technique
关键词 钢管 顶管 壁厚 设计 验算 steel pipe pipe jacking wall thickness design calculation
  • 相关文献

参考文献2

二级参考文献7

共引文献7

同被引文献19

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部