摘要
主要讨论工程中大直径灌注桩静载检测过程中存在的技术难点及处理办法。主要解决锚桩与承载主梁的连接问题,其次解决工程桩锚桩钢筋的受力不均难题,最后解决工程现场遇到的各种困难。
This article focused on engineering existed load test in the technical difficulties and treatment in the process of large diameter bored pile static method. Main girder of the anchor pile and the bearing connection problem, then solved line uneven problem of engineering pile anchor pile reinforcement finally, solved the difficulties occurred in field engineering, through scientific and meticulous work perfectly finished the completion of 28000kN single pile static load test task.
作者
郭全生
王向平
付永刚
GUO Quansheng WANG Xiangping FU Yonggang(Sifang Engineering Quality Test Center in Hohhot, Hohhot lnner Mongolia 010010, China)
出处
《工程质量》
2016年第12期16-17,29,共3页
Construction Quality
关键词
超大吨位
灌注桩
静载检测
锚桩法
large tonnage: bored piles: static load test
the method of anchor pile