摘要 文章以安康水电站为例,从AGC与调度通讯、系统结构、运行模式、有功分配方式以及运行所需参数等方面详细叙述了基于H9000监控系统的水轮发电机AGC功能实施方案。这对同类大中型水电站发电机AGC功能的运行与试验有一定参考价值。 Taking Ankang Hydropower Station for an example, this paper described the implementation scheme of Hydro generator AGC function based on H9000 monitoring system respects of from AGC and dispatching communication, system structure, operation mode, active power distribution mode and operation parameters, etc. It has certain reference value for the operation and test of the AGC function of large and medium sized hydropower stations in the same type.
作者 张继康 Zhang Jikang(Health Hydropower Company of State Grid Shaanxi Electric Power Company, Ankang 725000, Chin)
出处 《无线互联科技》 2016年第24期85-86,共2页 Wireless Internet Technology
关键词 H9000监控系统 水轮发电机 AGC功能 H9000 monitoring system hydro generator AGC function
  • 相关文献

参考文献5

二级参考文献12

共引文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部